Jump to navigation links Jump to main content Jump to footer links
St. James, LA

USD - Railcar Unloading Terminal

Crude Oil Multi-Phase Project

A multi-phase Crude-by-rail unloading facility capable of offloading three (3) unit trains per day. Includes 120 total unloading spots, over one (1) mile of piping to bulk storage, with six (6) 800 HP vertical turbine pumps.

Featured Energy Projects