airport

//////////////////////

HYDRANT FUELING SYSTEMS

 

TANK FARMS

 

FUEL FLUSHING

 

 

Since 1992 Kinley Construction Group has consistently established itself as a leader in mechanical  construction of large aviation projects. Kinley has a vast experience from the successful completion of a large number of aviation projects at major airports and military bases throughout the country.

Kinley Construction Group's reputation has proven through years of experience and dedication to outperform the competition by holding quality, safety and performance to the highest standard.  

 

Hydrant fueling systems

IAH - Houston, TX
IAH - Houston, TX

Relocated 16” fuel mains to allow for a bypass of the main fuel lines during construction of the Terminal B North. All bypass piping was executed under an accelerated schedule to keep the Terminal Construction within MCC/UAL committed schedule duration. Work also included the installation of 4ea. Concrete Fuel Vaults and 36ea. Hydrant Pits with associated 16” and 12” fuel mains for the new Terminal B North.

ATL - Atlanta, GA
ATL - Atlanta, GA

Installed 20”x24” Double-wall piping to allow for the construction of the Automated People Mover (APM) Tunnel, which connected to the new International Terminal.

TPA - Tampa, FL
TPA - Tampa, FL

Work included modifying and replacing existing tank bottoms, as well as installing new liner and fire protection.

IAH - Houston, TX
IAH - Houston, TX

Relocated 16” fuel mains to allow for a bypass of the main fuel lines during construction of the Terminal B North. All bypass piping was executed under an accelerated schedule to keep the Terminal Construction within MCC/UAL committed schedule duration. Work also included the installation of 4ea. Concrete Fuel Vaults and 36ea. Hydrant Pits with associated 16” and 12” fuel mains for the new Terminal B North.

1/3

IAH - Houston, TX

Houston, TX
Houston, TX
Houston, TX
Houston, TX
Houston, TX
Houston, TX

ATL - Atlanta, GA

Atlanta, GA
Atlanta, GA
Atlanta, GA
Atlanta, GA

TPA - Tampa, FL

Tampa, FL
Tampa, FL
Tampa, FL

TANK FARMS

DFW - Dallas, TX
DFW - Dallas, TX

Work included the install of a new fueling system for Terminal “D” and increasing the overall fuel capacity with new tank storage. Our scope also included the install of 67 hydrant fueling pits, 3200 linear feet of 14” loop piping and hot-tapping into existing system.

RSW - Riverside, CA
RSW - Riverside, CA

Included the construction of a bulk fuel storage facility with two (2) Jet A storage tanks, loading and unloading positions, control building for fuel lab, and an electrical pump control room.

TPA - Tampa, FL
TPA - Tampa, FL

Work included modifying and replacing existing tank bottoms, as well as installing new liner and fire protection.

DFW - Dallas, TX
DFW - Dallas, TX

Work included the install of a new fueling system for Terminal “D” and increasing the overall fuel capacity with new tank storage. Our scope also included the install of 67 hydrant fueling pits, 3200 linear feet of 14” loop piping and hot-tapping into existing system.

1/3

DFW - Dallas, TX

DFW - Dallas, TX
DFW - Dallas, TX
DFW - Dallas, TX
DFW - Dallas, TX
DFW - Dallas, TX

RSW - Riverside, CA

RSW - Riverside, CA
RSW - Riverside, CA
RSW - Riverside, CA
RSW - Riverside, CA

TPA - Tampa, FL

TPA - Tampa, FL
TPA - Tampa, FL
TPA - Tampa, FL
 

fuel flushing

TPA - Tampa, FL
TPA - Tampa, FL

TPA - Tampa, FL
TPA - Tampa, FL

PCA - Port Canaveral, FL
PCA - Port Canaveral, FL

TPA - Tampa, FL
TPA - Tampa, FL

1/11